How Long Does a Pool Take To Build?

It normally takes 6 to 10 weeks to build a swimming pool. There are a number of factors that come into play that will ultimately determine how long your pool will take to construct. There are a multitude of different phases that take varying lengths of time to complete: Design & Permits, Excavation, Steel, Plumbing, Electrical, Gunite, Plastering, Vinyl, Fiberglass, Decking, Landscaping and Custom Features. Exactly how long pool construction will take is also contingent on a number of factors such as how long it takes to procure permits, whether or not we encounter rock during excavation and a few other factors as well.