There are tons of swimming pools in Dallas, and they all vary in shapes and designs. If you are on this page, chances are that you are interested in building a swimming pool in your backyard. Generally, it takes between 15 and 30 days to build a pool based on the design.

Primarily, there are three types of in-ground pools in Dallas: gunite, fiberglass and vinyl liner. They are a mixture water, sand, and cement.

The construction refers to a lot of stages, such as excavation, installation and decking installation. The last stage involves the pool inspection. Now, let’s take a look at different types of in-ground pools and find out how much time the construction will take based on the type of pool you want to build.

raised spas

Vinyl liner

Vinyl liner comes in three types: polymer wall, cement wall and steel wall. According to Seasonal Pools, the construction methods for these pools is the same and takes between 30 to 50 days.

Based on the project complexity and the number of inspections, the time it will take to complete the project will vary.

swimming pool designsFiberglass

Fiberglass pools are also known as “drop-in pools” or “pool in a day”. Although  most of the time, a fiberglass pool is an in-ground pool and filled with water in 24 hours as far as construction is concerned. The construction process of these pools in Dallas may take up to 30 days in most cases.

Actually, the construction time depends upon the project complexity, the number of required inspections, and the type of finishing work. So, if more inspections are needed, more time will be needed to complete the project. In the same way, if you want to add a lot of decorations, more time will be required to meet your desired needs.

Gunite pools in boiseConcrete (Gunite)

As far as the construction time is concerned, gunite pools in Dallas take the longest to construct. According to the reports from Seasonal Pools, the average construction time for concrete pools is between 45 and 75 days. What is the reason behind this delay? The first reason concrete pools take much longer to build is that they require at least 28 days to set or cure properly.

Aside from this, there is more finishing and labor work involved. Besides, seasonal conditions like temperature and time of the year also have an impact on the time it takes to complete the work. In winter, the pool will take longer to cure or set.

Like other types of construction, the pool construction time depends upon a lot of factors like the number of inspections and the complexity of the project.

So, if you are going to build a swimming pool in your own backyard, you can get a personalized offer from Premier Pools & Spas. We will help you figure out the cost of your pool and the time it will take us to get your pool ready. We have built so many pools in Dallas.