Construction of an inground vinyl pool needs completion in several phases. Right from obtaining the permits to excavation and landscaping, there’s a lot to do before you can swim in your pool. If you are hiring pool professionals for the job, ask them about the inclusions in the package. Here is the detailed process of building vinyl liner pools.

vinyl pool liner replacement

Initial Consultation

The process to build an inground vinyl pool starts with initial consultation and estimation. In this phase, you need to talk to your pool builder about your vision, expectations, and budget. The representatives of the company will discuss important information related to the process. It is during this phase that you should discuss the size, layout, design, and financing options. After finalizing everything, the work will start.

On-Site Design Process

Vinyl liner pools allow customization of design and shape of the pool. Hence, the pool designers will come to your home and discuss the possible options. The design depends on the availability of space, your preferences, and budget. Also, they will consider the location for the pool and features that will add more usability to space. Finally, they will give you the blueprint of design to start construction.

Obtaining Permits

After other things fall in place, on-site plans will be drafted in accordance with your design preference. These plans are also used to go through the permit process for construction of your pool. You need to get permits from local authorities before starting the construction. A reliable pool contractor will handle this task as a part of the construction process.

Charlotte pool Installation

Excavation

Once you get the permits, it’s time to start digging. In fact, excavation is the first phase of the actual process. It takes 1-2 days to complete demolition, grading, and excavation of the ground for the pool.

Installation of Pool Equipment

This phase involves trenching and running the electrical and plumbing lines in your inground vinyl pool. The pool equipment will be installed at the right locations as per the plan. After installation of equipment, the builder will complete electrical fittings for lighting, filtration, or any other additional feature.

Installation of Vinyl Liner

In the final phase of the construction process, the pool builders will install the vinyl liners in the desired location. They prepare the pool floor with a hard bottom or sand before installing the liner. This treatment creates a smooth surface and fills the voids created by excavation. Also, they will construct the interior block wall and lay down the pre-decking steel during this phase.

Filling the Pool

After coping and decking the pool edges, the pool is filled with water. Depending on the water pressure, it may take 1-2 days to fill up the pool. Once it is full, a representative of the company will come to your home for final consultation. They will add finishing touches and provide you the tools required for pool maintenance.

Now, on completion of all these steps, you’re ready to take a swim in your glistening new inground vinyl pool.

Comment On This Post