The Pool Kings stay near home for this pool project. Located right in El Dorado Hills, California is the million dollar view pool! Paul and Brian have some unexpected surprises through this episode of Pool Kings. While building a tropical island for the King family, Brian is concerned about a part of the design that might slide off the cliff, and his first baby is born!
A Million Dollar View
Megan and David King live in Northern California with their three kids. The Kings wanted to move to El Dorado Hills as soon as possible, so they purchased a lot of land. The only catch is that there wasnโt a house there yet. While the construction of their house is going on, the Kings calledย the Pool Kingsย to build them a tropical resort swimming pool at the same time. Their house was estimated to be finished 6-7 weeks after their swimming pool was completed.ย โWe want to have a property that everyone will love.โย Meagan says. Their swimming pool is going to be almost 1500 sq ft, it will essentially take up the entire backyard. The only concern that the Pool Kings have is that the back swimming pool doesnโt slide down the steep hill at the end of the Kingโs property. This natural oasis is going to consist of a 20 ft wide beach entry, a lazy river which will surround their own personal island. It will also have a bridge that leads from the Island to the back of the swimming pool, where a raised sky deck will be. The island is going to be will be 320 sq ft with bar stools surrounding it. There will be another water fall that is 6 ft tall and 25 ft long. On either side of the raised sky deck will be sheer waterfalls. Towards the front of the swimming pool, there will also be another area for additional seating. These chairs will surround a raised fire pit.ย โThis will be a perfect place to roast marshmallows.โย Paul adds.ย
Incorporate the Slide!
While Megan and David are in love with the design, the Pool Kings get to work.ย The excavation process starts, and Brian finds a solution to support where the raised sky deck will be. To ensure that this part of the project doesnโt slide down the hillside, the crew reinforces the designated area with more re-barb and they gunite this section first for more support. Megan comes out to check up on the excavating process, but thatโs not the only reason shes here.ย โHi Paul, the kids and I were talking and weโd love it if you guys can add a slide somewhere into the design?โย Megan asks. Paul assures the King family that he can add a 15ft slide in between two waterfalls. After the pool is filled with gunite, Brain checks on the bar stools. He soon realizes the bar stools are too short compared to where the top of the islands surface will be.ย โIt almost feels like Iโm seating at the kids table.โย Brian says jokingly. He then asks the cement guys to make the bar stools a little taller, that way the King family will be able to sit comfortably on the bar stools. The next step to accomplish is plastering the pool, plaster cures when the swimming pool is filled with water and normally takes a few days, but with the size of this pool, itโs going to take 7-10 days.
A Surprise Reveal
While Paul is revealing the Kingโs their new swimming pool, Brian calls and announces he couldnโt make it because his wife just had their baby! Everyone is filled with joy. The Kings love their new swimming pool, and Brian is now a dad! โIt is truly incredible.โ Megan says to Paul. โYou guys did an amazing job. We love it!โ David says. โThank you Pool Kings!โ The King kids shout together.