Pool ownership is quickly becoming a necessity and a reality for most Tucson homeowners. The necessity of pool ownership results from the awareness of the amazing benefits that such pools give homeowners. These types of benefits include the ease of use, privacy, and exclusivity of usage of the swimming pools. A pool in your Tucson outdoor space will also save you on the difficulties and stress linked to using a community pool. Before you start a pool building project, you should be familiar with specific factors that can make the whole process successful. It is important to do research, to have the needed information and understanding about the requirements in the pool building project.

pool building project

Swimming Pool Building Project and What to Expect:

1. The Initial Stage

To start with, there are lots of stages that take place in your pool building project. Each of these phases might take one day or more to finish. The professionals will measure the space, determine the property line, and consider the utility line and other easements and delays too.

Once the experts get done with all the initial and technical stuff, you’ll work with them to choose the design and finalize the plans for the pool building project. Once complete, you will approve the plans and design. We’ll then get all the needed permits.

2. Next Phases

The next phase of the pool building project is excavation. This may even need the removing your any obstruction, which includes your trees or plants. Remember that you may also find a lot of damage done to the landscaping and grass during construction.

Costs can increase tremendously during digging. Be ready in the event they encounter across unanticipated problems like solid bedrock or high water table.

pool building project

3. Plumbing and Constructing

Now the pool installation will actually start. The experts reinforce the excavated hole and exacting the shape. After that, the concrete/gunite stage starts, and the pool actually resembles a pool. The gunite should set and dry, and your outdoor space will most likely be a mess which is anticipated during a huge pool building project such as this.

4. Finishing Touches

Once constructed, our expert team will then finish the tiling, electrical, and plastering. After all is complete, the final cleaning and installing equipment will start, after which you’re done!

The pool specialists will inspect how all the equipment operates, so taking notes is important. They will also go over the pool’s chemistry and the significance of regular and the right maintenance. Throughout the early days and weeks, the experts do everyday inspections to make sure that everything works properly. We’ll go over these inspections with you as well. And then lastly, your dream pool is ready for using and enjoying.

A pool building project is strenuous, involving, and intense, task that needs careful planning, preparation, timing, and accurate execution. There are many logistical issues encountered when constructing a pool. It’s recommended that you get a reliable, knowledgeable, and the right company to do your pool building project in Tucson.

pool building project

Need an Award-winning Builder for Your Pool Building Project?

Do you want to know more about what goes into a pool building project? Get in touch with the professional team at Premier Pools & Spas of Tucson today to start creating your dream pool.

  • Please enter your 10 digit phone number
  • Each franchise is independently owned and operated
    By submitting a lead form customers opt-in for for direct communications via phone, text or email by Premier Pools & Spas, Premier Pool Service and other brands operated under Premier Franchise Management.
  • Hidden
  • Hidden
    YYYY dash MM dash DD
  • This field is for validation purposes and should be left unchanged.